1
/
of
10
Komatsu D31EX D31PX D37EX D37PX-21 Dozer Service Manual PDF | 2004-2008
Komatsu D31EX D31PX D37EX D37PX-21 Dozer Service Manual PDF | 2004-2008
Regular price
$9.99 USD
Regular price
$14.99 USD
Sale price
$9.99 USD
Unit price
/
per
Instant Download — English Manual - Link sent via email
✓ Searchable PDF
✓ 60-Day Guarantee
Couldn't load pickup availability
KOMATSU 2004-2008
Komatsu D31EX D31PX D37EX D37PX-21 Dozer • Service Manual
Complete shop manual for the 2004-2008 Komatsu D31EX-21, D31PX-21, D37EX-21, and D37PX-21 crawler dozers, covering structure and function, maintenance standards, testing and adjusting, and full disassembly and assembly procedures for all major systems. Everything a technician or owner needs to service, repair, and overhaul these Komatsu blade dozers powered by the SAA4D102E-2 engine. Delivered instantly as a fully searchable PDF compatible with any device.
- Adobe Acrobat (PDF) format
- Fully searchable
- Easily print any or all content
- Everything needed to repair & maintain your machine
- Troubleshooting instructions, wiring diagrams, and reference material
Models Covered
- Komatsu D31EX-21 (Serial No. 50001 and up)
- Komatsu D31PX-21 (Serial No. 50001 and up)
- Komatsu D37EX-21 (Serial No. 5001 and up)
- Komatsu D37PX-21 (Serial No. 5001 and up)
Table of Contents
- 01 General
- 10 Structure and Function, Maintenance Standard
- 20 Testing and Adjusting
- 30 Disassembly and Assembly
- 90 Others
What's Included
- Engine service and overhaul procedures for the Komatsu D31EX D31PX D37EX D37PX-21
- Hydraulic pump, control valve, and pressure testing
- Cylinder rebuild and hydraulic hose routing
- Blade, ripper, and lift cylinder service
- Track frame, rollers, idlers, and undercarriage procedures
- Power train, steering clutch, and final drive service
- Electrical troubleshooting and fault code reference
- Scheduled maintenance intervals and lubrication points
- Specifications and torque values for the Komatsu D31EX D31PX D37EX D37PX-21
- Wiring and hydraulic diagrams
Features
- Searchable and printable PDF
- High-resolution diagrams and schematics
- Works on PC, Mac, tablet, and mobile devices
- Important: This is a digital PDF manual. No paper book will be provided.
Don't See What You Need?
- We maintain thousands of reference guides.
- Message us. We can point you to the correct listing or post the one you're looking for.
Buy With Confidence
- Fast access to digital download
- Reliable post-sale support
- 60-day worry-free returns
- If you have any questions about compatibility, model coverage, or what this manual includes, message us anytime.
Frequently Asked Questions
Q: Which Komatsu D31EX D31PX D37EX D37PX-21 Dozer models does this manual cover?
A: It covers the Komatsu D31EX-21 (Serial No. 50001 and up), Komatsu D31PX-21 (Serial No. 50001 and up), Komatsu D37EX-21 (Serial No. 5001 and up) and Komatsu D37PX-21 (Serial No. 5001 and up) for model years 2004-2008.
Q: What sections does the Komatsu D31EX D31PX D37EX D37PX-21 Dozer manual contain?
A: It has 5 main sections: 01 General; 10 Structure and Function, Maintenance Standard; 20 Testing and Adjusting; 30 Disassembly and Assembly; 90 Others.
Q: What repair and service procedures does the Komatsu D31EX D31PX D37EX D37PX-21 Dozer manual cover?
A: The listing covers: Engine service and overhaul procedures for the Komatsu D31EX D31PX D37EX D37PX-21; Hydraulic pump, control valve, and pressure testing; Cylinder rebuild and hydraulic hose routing; Blade, ripper, and lift cylinder service; Track frame, rollers, idlers, and undercarriage procedures; Power train, steering clutch, and final drive service; Electrical troubleshooting and fault code reference; Scheduled maintenance intervals and lubrication points; Specifications and torque values for the Komatsu D31EX D31PX D37EX D37PX-21; Wiring and hydraulic diagrams.
Q: Does the Komatsu D31EX D31PX D37EX D37PX-21 Dozer manual include wiring diagrams?
A: Yes. The listing includes wiring and hydraulic diagrams.
Q: Does the Komatsu D31EX D31PX D37EX D37PX-21 Dozer manual list torque specifications?
A: Yes. The listing includes specifications and torque values for the Komatsu D31EX D31PX D37EX D37PX-21.
Q: Can I use it to diagnose faults on the Komatsu D31EX D31PX D37EX D37PX-21 Dozer?
A: Yes. The listing includes electrical troubleshooting and fault code reference.
Q: Does it include maintenance schedules and service intervals?
A: Yes. The listing includes scheduled maintenance intervals and lubrication points.
Q: Does this manual cover earlier or later model years?
A: This listing covers model years 2004-2008 only. If your machine is from a different year, message us with your model and year and we will point you to the correct listing.
Q: Is this the right manual for my Komatsu D31EX D31PX D37EX D37PX-21 Dozer?
A: It is the right manual if your machine is one of the models listed under Models Covered and was built in 2004-2008. If you are not sure, message us with your model and year and we will point you to the correct listing.
Q: How do I receive this manual?
A: You receive a download link by email immediately after purchase. No physical item is shipped. The PDF works on any PC, Mac, tablet, or phone with free Adobe Acrobat Reader.
Independent Supplier Notice
DAL Manuals is an independent digital manual supplier. Brand names and model designations are used only to identify manual compatibility. DAL Manuals is not affiliated with, endorsed by, or sponsored by any manufacturer named on this page.
Shipping & Returns
Shipping
- Instant Digital Delivery
Returns
- If you're not fully satisfied, simply contact us for a no-hassle refund.
Share

More Komatsu Manuals
-
Komatsu 830E Serial A30708-A30732 Dump Truck Service Manual PDF
-
Komatsu D150A-1 D155A-1 Dozer Service Manual PDF | 1988-1992
-
Komatsu D155AX-5 Bulldozer Service Manual PDF | 2001-2005
-
Komatsu D355A-3 Bulldozer Service Manual PDF | 1989-1993
-
Komatsu D55S-3 Dozer Shovel Service Manual PDF | 2008-2012
-
Komatsu D65E D65P D65EX D65PX-12 Dozer Service Manual PDF | 2001-2005
-
Komatsu D85EX-15 D85PX-15 Dozer Service Manual PDF | 2004-2008
-
Komatsu Galeo D155AX-6 Bulldozer Service Manual PDF | 2006-2010
Featured collection
-
BMW S1000 XR K69 Motorcycle Service Manual PDF | 2022-2025
Regular price $14.99 USDRegular priceUnit price / perSale price $14.99 USD -
Royal Enfield Himalayan 450 Motorcycle Service Manual PDF | 2022-2026
Regular price $14.99 USDRegular priceUnit price / perSale price $14.99 USD -
Royal Enfield Hunter 350 Motorcycle Service Manual PDF | 2021-2025
Regular price $14.99 USDRegular priceUnit price / perSale price $14.99 USD -
Honda Talon 1000 UTV Service Manual PDF | 2019–2024
Regular price $14.99 USDRegular priceUnit price / perSale price $14.99 USD -
CFMOTO UFORCE U10 UTV Service Manual PDF | 2025-2026
Regular price $14.99 USDRegular priceUnit price / perSale price $14.99 USD -
Honda CB750 Hornet Motorcycle Service Manual PDF | 2023-2026
Regular price $14.99 USDRegular priceUnit price / perSale price $14.99 USD